Skip to main content

FTL — SPAIN → POLAND

Full Truckload from Spain to Poland

Dedicated FTL service from Spain to Poland. On request per truck. 3–4 days transit. 13.6 LDM, 24,000 kg payload. No customs required (EU–EU).

3–4 daysTransit Time
On requestFrom /Truck
24,000 kgMax Payload
13.6 LDMLoading Metres
≤2 hoursQuote Response
26+Countries Served
Daily on core corridorsDepartures
GB & CHCustoms-managed corridors
ISO 9001
ISO 14001
ISO 45001
TAPA TSR

Industries we move on this corridor

FTL Pricing — Spain to Poland

VehicleRate RangeTransitCapacity
Standard TautlinerOn request3–4 days13.6 LDM / 24 t / 86 m³
Mega Trailer+5–10%3–4 days13.6 LDM / 24 t / 100 m³ (3 m height)

Rates per dedicated vehicle. No customs required (EU–EU). Distance: ~2,400 km. Fuel surcharge at current ASTIC index. Quotes confirmed at booking.

Vehicle Types Available

Standard Tautliner

13.6 LDM, 24 t payload, 86 m³. Side, rear, and top loading.

Mega Trailer

13.6 LDM, 24 t, 100 m³. 3 m internal height for volume freight.

Refrigerated

Temperature-controlled -25°C to +25°C. ATP-certified.

Flatbed / Open

For oversized cargo, machinery, and out-of-gauge loads.

When to Use FTL vs LTL or Groupage

Use FTL when:

  • Cargo fills 10+ LDM or weighs 10+ tonnes
  • Time-critical, direct service needed
  • Exclusive vehicle required (no co-loading)
  • Hazardous goods (ADR) or temperature-controlled

Consider LTL or Groupage instead when:

  • Shipment is under 10 LDM (LTL: 2–10 LDM)
  • Under 2 LDM — groupage saves 50–70%
  • Cost is the priority over speed
  • Flexible delivery schedule
LTL from Spain →Groupage from Spain →

Related Corridors

Related Guides

Frequently Asked Questions

How long does a full truckload from Spain to Poland take?

An FTL from Spain to Poland takes 3–4 days via France and Germany. Direct, dedicated vehicle with no intermediate stops.

Which Polish cities does Trans-road FTL serve?

All major Polish logistics centres: Warsaw, Kraków, Wrocław, Poznań, Gdańsk, Łódź, and Katowice.

Is Poland FTL pricing competitive vs rail?

Road FTL offers faster transit (3–4 days vs 5–7 for rail), door-to-door service, and greater flexibility. Rates are competitive for time-sensitive cargo.

Get an FTL Quote — Spain to Poland

Tell us your origin, cargo weight, and required loading date. We confirm vehicle availability and rate for Poland.

Request a Quote →